The T6 line arrives in Villeurbanne

Extension of the T6 line to Villeurbanne
A new tram ring line to connect the Eastern Hospitals to the La Doua campus in 20 minutes. Published on Je Visite Lyon · based on SYTRAL Mobilités (February 14, 2026)

Mobility · East Lyon · Tramway T6

Thanks to 5.4 km of additional track and 10 new stations, the extension of the T6 line now connects the Eastern Hospitals to the Lyon-Tech La Doua Campus – INSA Lyon in just 20 minutes.

A new, structuring ring road for eastern Lyon

The extension transforms the T6 into the first major tramway ring road inside the ring road, connecting major hubs: Hôpitaux Est, Jules-Grandclément, Gratte-Ciel, La Doua campus.

«"The commissioning of the T6 line extension on February 14, 2026, will connect the Eastern Hospitals to La Doua in 20 minutes thanks to 5.4 km of additional track and 10 new stations."»

The 4 ambitions of the project

  • Improve the provision of public transport.
  • Redevelop public spaces and add greenery.
  • Strengthen the TCL network (metro lines A, B, D, trams T1, T3, T4…).
  • Encourage active mobility.

A very connected line

The T6 dessert:

Gerland Mermoz Grandclément Skyscraper Eastern Hospitals ENS Lyon La Doua – INSA

A tramway that transforms the city

The project rethinks public space: widened sidewalks, separated lanes, green strips, modernized street furniture.

Rainwater infiltration trenches have been created under the tracks. "8 hectares are affected by this system, representing 55 % of the T6 route," contributing to the recharge of groundwater.

The return of nature to the city

500 trees have been planted to create pockets of coolness and promote biodiversity. Shelters for birds, bats and lizards complete the development.

Stations designed for travelers

The new stations offer more comfort: enhanced signage, totems, guidance strips, and vegetated pergolas.

Stations adapted to the neighborhood

  • Respect for existing trees.
  • Vegetated pergolas (Kimmerling, Grandclément).
  • Minimalist shelters in the Gratte-Ciel sector.

Roger Planchon Station

Reuse of metal beams and posts from old factories, pergola, flowerbeds and enhanced vegetation.

Art at Villeurbanne Station

The artist Io Burgard signed the work Fluid stations, inspired by the Rize, a historic underground watercourse.

New bus service: a strengthened network

From August 31, 2026, several lines will be modified to optimize connections with T6.

Line C27

Direct link Saxe-Gambetta ↔ Vaulx-en-Velin, frequency 7 min.

Line C9

Enhanced service to Ferrandière + 2 new stops.

Line C26

North-South link complementary to the T6.

Line 69

New service Cité Internationale + Transporter.

A responsible construction site

Low carbon rails (97 % recycled), aluminothermic welding, low carbon sleepers, reuse of excavated soil.

Professional integration

80,000 hours completed by people far from employment, 23 drivers recruited, 350 TCL agents trained.

Video: The extension of the T6 line in pictures

Discover the new section of tram line T6, its stations, and its facilities in this video.

Why is this good news for your visits to Lyon?

For urban explorers and members of I'm Visiting Lyon Together, The T6 simplifies travel in eastern Lyon and opens up new discovery routes.

Share this article:

Related articles

This Headline Grabs Visitors' Attention

A short description introducing your business and the services to visitors.
en_GB

Pierre Bossan

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.